Sign In | Join Free | My entremaqueros.com
China HORIZON FORMWORK CO., LTD. logo
HORIZON FORMWORK CO., LTD.
HORIZON FORMWORK CO., LTD. Professional manufacturer of formwork and scaffolding systems
Site Member

7 Years

Home > Scaffolding Steel Prop >

38mm X 600mm Scaffolding Leg Screws , Construction Screw Jacks BS1139 Standard

HORIZON FORMWORK CO., LTD.

38mm X 600mm Scaffolding Leg Screws , Construction Screw Jacks BS1139 Standard

Brand Name : HORIZON

Model Number : EN1065 Steel Prop

Certification : SGS

Place of Origin : CHINA

MOQ : 1500 pcs

Price : pls ask HORIZON

Payment Terms : L/C, T/T

Supply Ability : 20000 pcs per week

Delivery Time : 15-25 days

Packaging Details : pallets, bundles, bulk

Material : Q235 steel pipe

OEM : Available

finishing : Electric galvanized

Standard : EN1065

Size : Prop 30-300, prop 30-350

Application : for slab formwork support

Load capacity : 30KN at top height

Contact Now

Euro Scaffold Steel Prop 30KN With EN1065 Standard, Adjustable for Table Formwork

HORIZON EN1065 Props are designed for shoring horizontal formwork as well as for the various requirements of shoring that may arise on site, however always respect load capacity limitations and assembly instructions.

The high load capability makes HORIZON props the top choice offering reliability and safety for any construction job.

Excellent quality is guaranteed by using high quality of raw materials, the manufacturing process and final treatment applied to the props. All these result in safe and efficient use on sites.

Specification Capacity (KN) Height (mm) Dia (mm) Weight (Kg)
HZP30-300 30 1650-3000 76/63 20.9
HZP30-350 30 1970-3500 76/63 23.0
HZP30-400 30 2210-4000 76/63 25.0
HZP20-300 20 1650-3000 60/48 15.7
HZP20-350 20 1970-3500 60/48 16.6
HZP20-450 20 2460-4500 60/48 28.2
HZP20-500 20 2710-5000 60/48 30.5

Important Instructions:
• Respect the prop spacing in accordance with the project.

• Prop load capacities and engineer’s design must be observed.

• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.

• Check formwork and prop erection before concrete pouring.

• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.

• Avoid the sudden emptying of the concrete bucket onto the formwork.

• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.

• Before starting any dismantling operation, check the state of the props.

• After removal, props should not be irregularly piled up.
38mm X 600mm Scaffolding Leg Screws , Construction Screw Jacks BS1139 Standard


Product Tags:

push pull props

      

adjustable telescopic steel props

      
 38mm X 600mm Scaffolding Leg Screws , Construction Screw Jacks BS1139 Standard Manufactures

38mm X 600mm Scaffolding Leg Screws , Construction Screw Jacks BS1139 Standard Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: HORIZON FORMWORK CO., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)
 

Friendly Links: www.everychina.com

Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们

Copyright © 2009 - 2024 entremaqueros.com. All rights reserved.